REVIEW BRIEF / 01
Software Development Brief: Compare the Exclusions
Prepare comparable proposals for a web application, mobile product or custom business system.
Blank CSV included →Pharos Production / Capacity planning
Estimate recovery time while new work keeps arriving. Compare your successful completion rate with the capacity needed to clear a backlog inside a chosen window.
A faster consumer can still miss the deadline. Start with the net rate, then inspect the work left at the end.
Steady-rate model · No queue connection · Local JSON export
01 / Set the assumptions
02 / Read the projection
Enter your assumptions to calculate.
| Elapsed minutes | Work items |
|---|---|
| Pending | Pending |
This is a planning estimate. It does not account for bursts, work-item cost, ordering constraints or downstream saturation.
Subtract the arrival rate from successful completions to find the net drain rate. Divide the initial backlog by that net rate only when it is positive. If completions equal arrivals, an existing backlog stays level. If arrivals are higher, it grows.
The required rate is an average under these assumptions. Add operational headroom through a separate capacity review. The required completion rate is displayed rounded upward to two decimal places. Other display values round to the nearest two decimals; exports retain the unrounded values.
With 25 arrivals and 40 successful completions each second, the queue loses 15 items per second. The initial 20,000 items drain in about 22.22 minutes. A 30-minute window needs about 36.12 successful completions per second when rounded upward to two decimal places.
If successful completions fall to 20 per second, the same backlog grows to 29,000 items after 30 minutes. A queue that is empty at the start can also grow when arrivals exceed completions.
Read alongside the method. External guidance provides context; the tool rules are defined on this site.
Sources reviewed 9 November 2026. Examples below are fictional planning inputs.